I visited my lot tonight and things are progressing very nicely. Check out the pics that I've uploaded starting with this one (if anyone from Mattamy Corp is reading this, as a law abiding citizen, I would never consider trespassing on a construction site :) ). The stair cases have been installed. Plumbing, HVAC and electrical have all been started and looks near completion. The furnace has been put in place as well (I noticed it's a Armana model).
The entire area is progressing. Block 501 has its outer brick completed and was having its siding installed while I was there. Block 507's outer brick is about 70% complete. I also noticed that a skid of bricks for my block was sitting out front. So I imagine that my block will be up next for its outer brick.
Monday, May 25, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment